Saturday, March 21, 2015

This is a set of photos of the Mechanical systems (heat and hot water) both are being changed today. at the same time as this change we also found out we could eliminate about 30' of baseboard this change should stop the extreme temperature deference between the first and third floors. Not a sexy improvement but I believe you should make all of the mechanical upgrades before the rest.


the next three pictures are after everything has been removed, we also increased the water line coming off the main from 1/4" to 1"